Design calculation for the adequacy check of the concrete floor, soil and steel plate for 100MT capacity crane

Activity  Design calculation for the adequacy check of the concrete floor, soil and steel plate for 100mt capacity crane

Client     Takreer through EMCO

Place     Abu-Dhabi, U.A.E.

Period   November 2017

 

Takreer intend to replace the damaged pipe rack member. Takreer engaged EMCO contractor to carry out the replacement of the damaged pipe rack member.  EMCO hired MR Vision to carry out design calculation for the adequacy check of the stability condition of the existing RCC grade slab and soil, where the 100MT crane is to be placed for erection of temporary support and replacement beam.